Days until R&D Completion
Posted: Sun Mar 05, 2017 11:37 am
Hi David,
Would it be possible in the R&D buldings to add a "days until R&D complete" bit under the bar.
For example I tend to go for 3 and 5 year cycles, and you watch the bar progress. Now say Im building something that needs a crop, a crop will sow at x date. I do not want to put the farm down until I need it, but I dont quite know the optimum time to put it down as their is only a bar progress, and not a numberical day counter (or even to tell me a month and year) it would be ready.
Could this be added ?
Thanks
Would it be possible in the R&D buldings to add a "days until R&D complete" bit under the bar.
For example I tend to go for 3 and 5 year cycles, and you watch the bar progress. Now say Im building something that needs a crop, a crop will sow at x date. I do not want to put the farm down until I need it, but I dont quite know the optimum time to put it down as their is only a bar progress, and not a numberical day counter (or even to tell me a month and year) it would be ready.
Could this be added ?
Thanks